Shakopee Fire Station

From the early needs assessment meeting to the construction of the new 23,000 sf main station, BKV Group worked closely with the fire station task force. The sloped site dictated a multi-level facility with the main lobby, fire administration and training room accessible from the upper plateau. Fire operations and apparatus were designed to be accessible from the lower level.