Williston Recreation Center

For the city-owned Williston Recreation Center, BKV Group provided comprehensive design services from early conceptual and feasibility study, design and documentation, through construction administration. Full architectural, interior, site and landscape design services were provided, as well as structural, mechanical, and electrical engineering. The new addition incorporates a new main entry that simultaneously brands the city-owned complex and solves vertical circulation. The end result is an integrated whole, spanning construction from 1969 and 1973 with the addition and renovation.